Week of 06/28/2007 - Compliments of the Crawford's: The first area of sand is in place at the beach on the small lake.
Viewed: 301 times.
|
Week of 06/28/2007 - Compliments of the Crawford's: The back wall stones have been placed and now they are preparing the area for matting and sand at the beach on the small lake.
Viewed: 289 times.
|
Week of 06/28/2007 - Compliments of the Crawford's: The completed back wall at the beach on the small lake.
Viewed: 274 times.
|
Week of 06/28/2007 - Compliments of the Crawford's: The back wall stones getting ready to be placed at the beach on the small lake.
Viewed: 279 times.
|
May 2007: The wall for a beach on the south side of the dam for the small lake is being poured.
Viewed: 282 times.
|
May 2007: The wall for a beach on the south side of the dam for the small lake is being poured.
Viewed: 283 times.
|
September 2005: Standing in the Prairie looking east at the new road in Phase 1A.
Viewed: 346 times.
|
August 2005: New poured retaining wall between Ohana Ridge and Phase 1A.
Viewed: 385 times.
|
June 2005: Adding storm sewer pipe in Phase 1A.
Viewed: 349 times.
|