Week of 08/01/2007: The first road paved in Phase 1B, called 229th Street until the curve and then it is called Chicory Street.
Viewed: 393 times.
|
Week of 08/01/2007: Pavers at work for the first road within Phase 1B.
Viewed: 360 times.
|
Week of 06/28/2007: Looking at the surveyors staking the first road in Phase 1B from Chamois Circle in Phase 1A.
Viewed: 366 times.
|
Week of 06/28/2007: The surveyors staking the first road in Phase 1B.
Viewed: 375 times.
|
Week of 06/28/2007: The surveyors staking the first road in Phase 1B.
Viewed: 360 times.
|
Week of 06/18/2007: A view of the small lake dam while working preparing the roads in Phase 1B for paving. Only about 4 feet to go to be filled to the top of the spillway!!
Viewed: 407 times.
|
Week of 11/05/2006: The spillway outlet of the small lake from Phase 1B.
Viewed: 479 times.
|
Week of 11/05/2006: A veiw of the small lake from Phase 1B.
Viewed: 514 times.
|
Week of 11/05/2006: Panoramic of the small lake from the north end of the dam on Phase 1B.
Viewed: 505 times.
|
Week of 11/05/2006: Panoramic of the backside of the dam and spillway from the north end of the dam on Phase 1B. You can see 228th Circle on the south end.
Viewed: 494 times.
|